Title | |
|---|---|
| Seattle Public Utilities (SPU) Director's Rule FIN-220.2, Development Charges | |
Description and Background | |
|---|---|
| Current Status: | Filed |
Legislative History | |
|---|---|
| Date Filed with Clerk: | December 29, 2025 |
| PDF Copy: | Clerk File 323628 |
Text | |
|---|---|
|
Director's Rule Title Development Charges Number FIN-220.2 Rev. no. 5 Responsibility Finance Division Supersedes N/A Pages 10 General Manager/CEO Signature /s/ Andrew Lee (electronic signature on file) Approval Date December 10, 2025 Effective Date January 1, 2026 1. PURPOSE To set charges for development-related services provided by Seattle Public Utilities (SPU). 2. DEFINITIONS Arterial streets. Every street, or portion thereof, designated as such in Chapter 11.18 of the Seattle Municipal Code, and other similarly designated streets outside the City of Seattle. Site-specific cost (SSC). A charge calculated by SPU that accounts for specific location and job site conditions. Determined before work is performed, a site-specific cost sums all labor, material, equipment, fringe benefits, overheads, taxes, and any other costs required to complete the work. Site-specific costs vary between sites in order to recover anticipated costs of providing a service at a specific location. System development charge (SDC). The system development charge shall be calculated as the product of the System Development Customer Equivalent (SDCE) and the System Development Unit Rate (SDCUR) (SMC.21.65.040.A.). Water SDCs are calculated, when applicable, for all new construction in SPU's direct water service area. Drainage and wastewater SDCs are calculated, when applicable, within the City of Seattle limits, unless otherwise authorized by an Out of City Sewer Agreement (SMC 21.20.020; RCW 35.67.310). Time and materials (T&M). The actual cost incurred by SPU for work performed, including labor, equipment, materials, applicable permit fees and taxes, pavement restoration, overhead costs and any similar costs, which is calculated by SPU after work has been completed. Water or wastewater system development customer equivalent (SDCE). A measure of the size of the new water service or the increase in size of an existing service. In calculating the water or wastewater SDCE, services are weighted by hydraulic capacity and expressed as a multiple of a single 3/4-inch domestic service (SMC 21.65.04.B.). Water system development unit rate (SDCUR). The original value of the water system, less the value of service meters, less the value of spent outstanding bonds as detailed in the Water Fund's annual financial statement, plus five years of interest from the date of asset service, attributable to a single customer with an equivalent -inch water service (SMC 21.65.04.D.). Wastewater system development unit rate (SDCUR). The original value of the sewer system less the value of spent outstanding bonds as detailed in the Drainage and Wastewater Fund's annual financial statement, plus five years of interest from the date of asset service, attributable to a single customer with an equivalent -inch water service (SMC 21.65.04.E.). 3. RULE NOTE: Total prices for services in the City of Burien will be higher to cover local utility taxes levied by the City of Burien (Burien Municipal Code 3.12.040). A. New Water Services 1) Installation Charges a) Domestic services Size (inches) Non-Arterial Arterial $4,800 $6,175 1 $4,975 $6,350 1 $8,050 $9,150 2 $8,975 $10,050 2 High Flow $9,425 $10,525 4 SSC SSC 6 SSC SSC 8 SSC SSC 10 SSC SSC 12 SSC SSC 16 SSC SSC 20 SSC SSC 24 SSC SSC b) Fire services Size (inches) Non-Arterial Arterial 2 $9,675 $10,825 4 SSC SSC The installation charge for a fire service larger than 4 inches will be based on a site-specific cost. c) Combination domestic and fire services Size (inches) Non-Arterial Arterial 1 $4,975 $6,350 1 $8,050 $9,150 2 $8,975 $10,050 2 High Flow $9,425 $10,525 4 SSC SSC 6 SSC SSC 8 SSC SSC 10 SSC SSC Any new water service installation deemed nonstandard by SPU will be based on a site-specific cost. 2) Discounts a) Common trench $1,500 Discount applies to each service installation standard charge, after the first, for services installed in a common trench with a maximum of two services allowed per trench. Discount applies to each trench separately. b) Manifold $1,500 Discount applies to each service installation standard charge, after the first, for services installed on a manifold. A maximum of 6 discounted services per manifold. c) Contractor supported $1,500 Discount applies to each service installation standard charge when the service installation is supported by a contractor's crew and equipment. B. System Development Charges (SDC) 1) Water and Wastewater Water Meter Size (inches) SDCE Water SDC Wastewater SDC 1 $6,900 $2,600 1 1.7 $11,730 $4,420 1 3.3 $22,770 $8,580 2 5.3 $36,570 $13,780 2 High Flow 8.3 $57,270 $21,580 3 11 $75,900 $28,600 4 17 $117,300 $44,200 6 33 $227,700 $85,800 8 53 $365,700 $137,800 10 77 $531,300 $200,200 12 104 $717,600 $270,400 16 168 $1,159,200 $436,800 20 244 $1,683,600 $634,400 24 330 $2,277,000 $858,000 The water SDC is based on the SDCUR of $6,900 multiplied by the appropriate SDCE. Fire service SDCs are 40 percent of the equivalently sized domestic water meter. The wastewater SDC is based on the SDCUR of $2,600 multiplied by the appropriate SDCE. Fire and irrigation water services are not subject to wastewater SDCs. 2) Drainage: $1,225 per 1,000 square feet of new hard surface. C. Existing Water Service Changes Changes to existing water services may be subject to system development charges. 1) Conversion: service type change; no change in size. Site-specific cost 2) Increase: new water service installation charge plus the service retirement charge (see sections 3A.1 and 3C.5). 3) Decrease: new water service installation charge plus the service retirement charge (see sections 3A.1 and 3C.5). 4) Relocation: new water service installation charge plus the service retirement charge (see sections 3A.1 and 3C.5). 5) Retirement: Size (inches) Service Retirement Charge to 2 $2,320 3 and larger $6,280 There is no charge for a - to 2-inch retirement if the retirement occurs in the same open trench and at the same time as a new water service installation. Additional service retirement charge for each additional trip to perform retirement due to requested delay. Street restoration charges may apply if repaved prior to retirement. Size (inches) Requested Delay Charge to 2 $1,390 3 and larger $3,770 D. Water System Improvements 1) Water main extensions and improvements Property owner installation a) Project administration $1,460 b) Design review and approval Work performed under an SDOT Street Improvement Permit (SIP) $670 Work performed under permit other than SDOT Street Improvement Permit (SIP) $2,200 c) Construction management (sum of three charges list below) Base. $5,500 Construction $510 per day Connection.. $1,630 per day d) Connection to existing water system (per excavation) Water Main Extension Size (inches) Labor Charge Material Deposit Initial Charge (per excavation) 2 $890 $1,690 $2,580 4 to 10 $4,740 $1,060 $5,800 12 and larger SSC Estimated Site-specific labor plus estimated materials e) Water quality retest.. $390 2) Water main extensions and improvements SPU installation a) Project administration... $1,460 b) Design review and approval Work performed under an SDOT Street Improvement Permit (SIP) $670 Work performed under permit other than SDOT Street Improvement Permit (SIP) $2,200 c) Construction and connection to existing system time and materials 3) Valves In lieu of water main or as identified on the Water, Drainage, and Wastewater Availability Certificate site-specific cost, with credit up to $25,000 per valve 4) Fire Hydrant Services (labor and materials) Adjust (raise/lower) . $1,510 Reset (move hydrant back or closer to the main or move hydrant horizontally left or right less than or equal to 5 feet; no retapping of the main) ... $6,490 New installation on existing water main $18,360 Relocate (move hydrant horizontally left or right more than 5 feet; retap main) ... $28,440 Retirement. $6,320 5) Fire Hydrant (materials only) Hydrant. $3,290 Hydrant Extension Kit. $430 Quick Connect Adapter... $260 E. Other Water System Services 1) Automated Meters (AMR) Installations for New Water Services (per trip) Size (inches) First AMR Installed Each additional AMR Installed to 2 $330 $190 4 and larger $600 $400 2) Hydraulic Flow Data, acquisition of: Where hydrant flow tests have been performed within the last 5 years, within 500 feet, and in the same water pressure zone. no charge SPU measures hydrant flow, flushes main, and prepares flow test report. $1,830 Preparation of hydraulic analysis report to meet fire flow requirements time and materials with $1,650 deposit Preparation of modeled flow report when flow test is not feasible, during a declared water emergency, or when the requested hydrant is not suitable for flow testing $250 3) Meter Exchange, 2-inch to 2-inch High Flow $1,460 4) Pressure reducer, design, and/or install: SPU designs time and materials with deposit of $8,200 SPU installs time and materials with deposit as specified below: 4-inch pressure reducer (2-inch bypass) . $31,000 6-inch pressure reducer (2-inch bypass) . $33,000 8-inch pressure reducer (4-inch bypass) . $41,000 5) Purveyor services as stated in contracts 6) Relocation of meter and box Limited to a lateral move of 24 inches site-specific cost 7) Ring and cover Small.. $390 (material only) Large...$820 (material only) 8) Saw cut $800 per job site 9) Standby charge When site/contractor is not ready as scheduled. $575 per event 10) Street restoration When SPU coordinates street restoration, costs are based on street paving type, condition, and the requirements of the local jurisdiction. Both of the following charges apply: SPU site inspection. $365 per job site Final paving/restoration site-specific cost 11) Temporary water services site-specific cost 12) Traffic control services for 2-inch and smaller water service installations $570 13) Transmission mains, water services tapped on time and materials but not less than the applicable standard charge 14) Water main cut and cap site-specific cost 15) Water main cut and connect site-specific cost 16) Work SPU deems unusual time and materials F. Permit and Inspection Charges Permit, inspection, and other related chargesrequired by a city, county, or the stateare in addition to the charges listed in this Director's Rule. These charges are imposed by other City of Seattle departments and other jurisdictions and are adjusted on a different schedule than this Director's Rule. Therefore, at the time of invoicing, the jurisdiction's current charge will be applied. Below are examples of these charges with associated prices as of the effective date of this Director's Rule. City of Seattle SDOT Street Use Permit Fee: ROW Mgmt., Complex Review $754 SDOT Street Use Permit Fee: Major Permits (SIP/UMP) $8,917 SDOT Traffic Control Plan Review $358 SDOT Street UseArterial Use Fee $260 SDOT Street Use Inspection Fee (initial and final) $358 SDOT Street Use InspectionPremium Time $718 Seattle ParksPermit Application Fee $200 Seattle ParksLimited-Term Permit Use Fee (per service) $325 Seattle ParksPermit Processing Fee $130 King County Utility Right of Way Construction Permit Fee $200 Utility Right of Way Inspection Fee $176 per site Trolley Overhead Deactivation Request $1,000 Trolley Overhead Deactivation / Reactivation $1,800 City of Shoreline Right of Way Use Permit (one day project) $780 Right of Way Inspection Fee (additional days) $260 per day City of Lake Forest Park Major Right of Way Use Permit $500 Major Right of Way Use PermitAdditional Street $255 City of Burien Right of Way Base Fee $366 G. Latecomer Agreements Application fee $1,090 Collection processing fee (per parcel) $220 Recording fee (per recording package) $310 H. Side Sewer Permit Application and Inspection Fees Permit fees include one hour of inspection time. Inspection time in excess of one hour will be billed separately. 1) Side sewers a) Installation, connection, relocation, or alterationall structures First connection. $375 Each pump installation (single, duplex, etc.) $75 Each additional connection $280 b) Additional connections to existing side sewersall structures Each additional connection $375 Each pump installation (single, duplex, etc.) $75 c) Additional direct connections to public sewerall structures Each additional connection $375 Each pump installation (single, duplex, etc.) $75 d) Reconnection to public sewerall structures Each reconnection $375 Each pump installation (single, duplex, etc.) $75 e) Temporary services for side sewersall structures Each temporary service $225 2) Repairs to side sewersall structures Each repair $280 Each pump repair (single, duplex, etc.) $75 3) Capping existing side sewersall structures Each line capped $375 4) Service drains and ancillary facilities a) Installation, connection, relocation or alteration to storm drain, combined sewer, on-site infiltration, curb discharge or direct discharge to receiving watersall structures Each connection $375 Each pump installation (single, duplex, etc.) $75 Each additional connection $280 b) Additional connections to existing service drainsall structures Each additional connection $375 Each additional pump installation (single, duplex, etc.) $75 c) Additional direct connections to storm drain, combined sewer, curb discharge, on-site infiltration or direct discharge to receiving waters Each additional connection $375 Each additional pump installation (single, duplex, etc.) $75 d) Reconnection to storm drain, combined sewer, curb discharge, on-site infiltration or direct discharge to receiving waters Each reconnection $375 Each pump reconnection (single, duplex, etc.) $75 e) Temporary services for service drainsall structures Each temporary service $225 f) Repairs to service drainsall structures Each repair $375 Each pump installation repair (single, duplex, etc.) $75 5) Inspection fee Inspection time in excess of the one-hour base fee $160 per hour I. Drainage and Wastewater Core Taps 1) Core Taps Size (inches) Normal hours After hours 6 $720 $1,080 8 or 10 $820 $1,230 size on size time and materials, with deposit of $1,500 time and materials, with deposit of $1,500 Standard charges will be reduced by the following amounts when the contractor is required to provide all materials for core taps performed by SPU: 6-inch tap $180 8- or 10-inch $210 2) Core Tap Inspection Customer must hire a contractor to perform core taps larger than 10 inches. The core tap will be inspected by SPU at the following charges: Core tap inspection performed on regular time $540 Core tap inspection performed after hours $900 4. AUTHORITY/REFERENCES SMC 21.04.100, Connection Minimum size Fees and charges SMC 21.04.465, Standard and administrative charges SMC 21.20, Sewer connections outside city limits SMC 21.28.230, Standard and administrative charges SMC 21.65.010 Authority SMC 21.65.020 System development charge SMC 21.65.040 Calculation of the system development charge SMC 3.02, Administrative code SMC 3.32.020, Adoption of rules Burien Municipal Code 3.12.040 FIN-219, Utility System Development Charges Requirements and Methodology RCW 35.67.310, Sewers Outside city connections |
|
Attachments |
|---|