Director's Rule
Title
Customer Charges Number
FIN-220.1 Rev. no.
3
Responsibility
Financial and Risk Services Branch Supersedes
N/A Pages
4
General Manager/CEO signature Approval date
Effective date
January 24, 2025
1. PURPOSE
To set charges for special services provided by Seattle Public Utilities (SPU).
2. DEFINITIONS
time and materials. The actual cost incurred by SPU for work performed, including labor, equipment, materials, applicable permit fees and taxes, pavement restoration, overhead costs, and any similar costs, which is calculated by SPU after work has been
completed.
3. RULE
A. Meter Charges
1) Meter test
Size (inches) Meter Test Charge
to 2 $170
3 to 6 $375
8 $480
10 $600
12 $720
Note: Charge waived if test results fail to meet American Water Works Association (AWWA) standards.
2) Meter removal
Size (inches) Meter Removal Charge
to 1 $135
1 to 2 $215
3 and larger time and materials
3) Meter reset
Size (inches) Meter Reset Charge
to 1 $135
1 to 2 $245
3 and larger time and materials
4) Special meter read
Customer requested meter readings $60
For obstructed meter readings $125
Adjust buried, obstructed or low
meter boxes or valve boxes caused by
customer installed landscaping or
resurfacing (-inch to 2-inch meters) $465
5) Meter shutoff and meter turn-on (Requests initiated by customer, customer's contractor, agent, tenant, or emergency responders acting to protect customer's premises; and for cross-connection control program. Collection and severance meter
shutoff and meter turn-on charges are listed in sections B2 and B3.)
Applies to all water services (domestic, fire, and combinations).
Meter shutoff $120 per trip
Meter turn-on $120 per trip
6) Top shutoff (TSO) installation (customer expedited request)
inch $155
1 inch $220
7) Trim customer-installed vegetation obstructing meter boxes or fire
hydrants $155
B. Collection and Severance
1) Property visit $30
2) Meter shutoff for nonpayment of utility bill $60
3) Meter turn-on once debt owed to utility is satisfied
During normal business hours
(8 am 3:30 pm, Monday-Friday,
excluding City holidays) no charge
After hours (other than normal hours) $80
4) Replace customer damaged lock $160
5) Illegal jumpers
Removal $135
Removal and slurry $220
Removal of slurry time and materials
C. Special Field Trips
On-property leak investigation and
City water service line is intact $120 per trip
Re-inspection required because
the requesting customer is not ready for
inspection by deadline or stated date $210 per trip
D. Hydrants, nonfirefighting use of
Hydrant use permit $215
Hydrant meter assembly rental $305
Note: All equipment must be returned in the same-as-issued condition. In the event of damaged or lost equipment, SPU will assess charges equal to the cost of damaged or lost equipment, including overhead cost.
Water consumption
Water consumption rates are based on the current City general service rates at the time of hydrant usage.
Water consumption for permits assigned a hydrant meter will be charged at 10 CCF per month or actual metered usage, whichever is greater. Permits assigned a hydrant meter are subject to per-day charges for the entire term of the permit if (a) there is
any evidence of hydrant meter tampering, or (b) there is damage to the hydrant meter that prohibits SPU from accurately determining the amount of water used.
If SPU determines water consumption will be less than 10 CCF per day or the permit is for fewer than 30 consecutive days, per-day charges will be applied for the entire term of the permit.
Per-day charges are equal to 10 CCF at current City general service rates.
During a declared water emergency, hydrant-permit users allowed to continue their permits will be charged at the established surcharge-general service rate, if any.
E. Cross-Connection Control Program
Reminder letters to customers who do not
provide acceptable proof of satisfactory
performance test of their backflow preventers
within 30 days of receiving original notification,
or to customers who have not installed
backflow preventers as required $105 each backflow preventer
Late assembly test shutoff notice $155
F. Sewer Submeter Setup (includes plan review, inspections and billing initiation)
Initial submeter setup $533
Each subsequent submeter on
same account installed at the same time $333
G. Late Payment
Late payment: Past due balances may be subject to a monthly interest charge based on the legal rate.
H. Returned Payments
Process returned payment $25
Note: This includes all forms of payment that have been returned by a bank or other financial institution.
4. AUTHORITY/REFERENCES
SMC 21.04.465, Standard, connection, and administrative charges (water)
SMC 21.28.230, Standard and administrative charges (wastewater)
SMC 3.02, Administrative code
SMC 3.32.020, Adoption of rules
SPU Policy CS-310, Customer Billing, Payments and Collections.
SPU Director's Rule CS-310.1, Customer Billing, Payments and Collections
SPU Policy/Procedure CS-105, Cross-Connection Control Program