Form revised: May 6, 2011

 

2012 BUDGET LEGISLATION FISCAL NOTE

 

Department:

Contact Person/Phone:

CBO Analyst/Phone:

Planning & Development (DPD)

Jeff Davis / 684-8071

Joe Regis / 615-0087

 

 

Legislation Title: AN ORDINANCE related to fees and charges for permits and activities of the Department of Planning and Development; repealing a section of Ordinance 123453; and amending Seattle Municipal Code Chapter 22.900A, Administration and Enforcement; Chapter 22.900B, General Provisions; Chapter 22.900C, Fees for Land Use Review; Chapter 22.900D, Fees for New and Altered Buildings and Equipment; Chapter 22.900E, Fees for Certificates and Registrations; Chapter 22.900F, Compliance and Other Inspections; and Chapter 22.900G, Fees Collected for Other Departments.

 

Summary of the Legislation: 

 

This legislation revises some of DPD’s permitting fees and charges, which were last revised and adopted as part of the 2011-2012 budget process.  The proposed fee revisions include corrections and adjustments to certain permit fees and other charges, creation of new fees and charges, the restructuring of certain fees, and the elimination of some fees and charges.

 

Background:  

 

DPD is primarily fee-supported and its fees and charges are necessary to provide financial support for the operation of DPD’s permitting operations.  All fees collected by DPD for processing DPD’s permits are used for that purpose, and the fee structure is reflective of the Seattle Municipal Code requirements to recoup the cost of providing the permitting service.

 

The proposed ordinance raises the minimum fee for Design Review projects and Type IV or Type V Council approvals from $2,500 to $5,000.  This change represents a shift in when fees are taken in, to ensure that DPD receives enough fees at intake to cover the cost of performing the initial reviews on certain projects, but will not raise the overall fees for these permit applications.  This fee change will affect approximately 10-12% of all land use permit applications, for only the most complex permit applications.  Examples of these projects include applications for full Design Review, Rezones and Council Conditional uses.  Streamlined design review will not be affected by this change.

 

Attachment A to this Fiscal Note “DPD Permit Fee and Charges Changes from 2011 Adopted Budget to 2012 Proposed” provides a summary of 2011 DPD fees affected by this proposed ordinance, and the proposed changes for 2012.  These fees have been reviewed to determine whether the cost of providing the service warrants a fee change, if improvements to the fee structure are necessary, or if new fees are required. 


 

 

 

_ X _   This legislation has financial implications.

 

 

Summary of Changes to Revenue Generated Specifically from this Legislation: 

 

 

Revenue Source

2012 Proposed

Planning and Development Fund (15700)

Building Development Fees

$17,700

Planning and Development Fund (15700)

Land Use Fees

$75,000

Planning and Development Fund (15700)

Other Fees and Charges

$13,650

Total Fees and Charges Resulting From Passage of This Ordinance

 

$106,350

(If new revenue is for a partial year, provide estimate for full year in the notes section below.)

 

Revenue Change Notes:  None.

 

 

Anticipated Total Revenue from Entire Program, Including Changes Resulting from this Legislation:

 

Fund Name and Number

Revenue Source

Total 2012 Revenue

Planning and Development Fund (15700)

Building Development Fees

$18,723,066

Planning and Development Fund (15700)

Electrical Fees

4,563,605

Planning and Development Fund (15700)

Land Use Fees

4,036,705

Planning and Development Fund (15700)

Site Review & Development Fees

1,529,766

Planning and Development Fund (15700)

Boiler Fees

1,203,809

Planning and Development Fund (15700)

Other Fees and Charges

1,328,211

TOTAL

 

$31,385,162

 

Total Revenue Notes:  None.

 


Other Implications:

 

a)      Does the legislation have indirect financial implications, or long-term implications?  No.

 

b)      What is the financial cost of not implementing this legislation?

This legislation, in addition to making a number of technical changes, does address areas where the revenues DPD collects through fees do not align with the cost of providing services.  Not implementing this legislation as proposed would continue situations where costs incurred are not supported by adequate revenue.  It is possible that this would result in reductions to services or programs in the future.

 

c)      Does this legislation affect any departments besides the originating department? 

No significant impacts to other departments are expected.

 

d)      What are the possible alternatives to the legislation that could achieve the same or similar objectives?

With respect to increasing certain fees, the City could contemplate reducing the level of service provided to its customers or could contemplate supplementing DPD’s budget with General Subfund resources to offset its increased costs. 

 

e)      Is the legislation subject to public hearing requirements?  No.

 

f)       Other Issues:  None.

 

 

Please list attachments to the fiscal note below:

 

Attachment A:  DPD Permit Fee and Charges Changes from 2011 Adopted Budget to 2012 Proposed

 

Attachment B: DPD Electrical Feeders Proposed Changes from 2011 Adopted Budget to 2012 Proposed


 

22.900A.030

 

 

 

 

 

 

 

Payment and responsibilities for fees

 

3

Fees and charges related to certificates and licenses.

2005

--

 

--

Clarification of responsibility for fees and charges not tied to permit issuance.

22.900A.040 and 22.900G.070

 

 

 

 

 

 

 

Parks Plan Review

 

4

New fee to recover Parks Department’s staffing costs for plan review.

New

n/a

 

$128/hour

Parks Department is including this proposed fee in their 2012 fee ordinance.

22.900B.020.E – Table B-1

 

 

 

 

 

 

 

Electronic Records

5

Fees for copies from electronic plans

New

n/a

 

8½" x 11" - $0.50 per printed page

8½" x 14" - $0.50 per printed page

11" x 17" - $0.50 per printed page

Charges for printed copies of electronic plans and records.

Diazo

 

5

Charges for plans reproduced onto Diazo from the microfilm library

2008

 

$5 per diazo

 

n/a

This fee is eliminated (no longer have the capability to make a copy onto a diazo).


 

22.900C.010 – Table C-1

 

 

 

 

 

 

 

Design Review and Type IV and V Discretionary Land Use decisions needing Council approval.

6 & 7

Minimum fee is raised for complex projects to cover the cost of initial reviews for Design Review project (except Administrative Design Review or Streamlined Design Review) and all Type IV and Type V site-specific Council approvals such as, but not limited to, Rezones, Council Conditional Uses, Major Institutions Master Plans, Public Project approvals, etc.  Fee description in Table C-1 #13 is consolidated into #10.

May 2005 -for Item 2

Jan. 2001 –for Items 10 and 13

Land Use Hourly x 10

 

Land Use Hourly x 20

Adjusted for Design Review Type IV and Type V land use approvals only; a higher minimum fee is required to cover the greater initial review hours for these project types.

Council concept approvals, Planned residential community development, etc., approvals

7

Fees for non-standard Type II land use approvals

2011

Land Use Hourly x 10

 

Land Use Hourly x 10

Clarified language for fee description in Table C-1 #9 to distinguish from land use approvals described in Table C-1 #10.

Major Institution  Deposit

7

Deposit required for Major Institution Master Plan review

2001

 

40 hour deposit

 

n/a

This deposit against hourly fees is no longer needed due to the implementation of monthly land use billings.

Pre-application Conference

8

NSF fee, in addition to remainder of fees due and any delinquent fees assessed

Jan. 2011

Land Use Hourly x 1

 

Land Use Hourly x 2

Adjusted to include the first hour of research and follow-up review time that normally occurs.

22.900D.010 – Table D-2

 

 

 

 

 

 

 

Mechanical, Part of Building Permit Application

11

Plan Review Fee – clarified to refer to “mechanical review”

Jan. 2011

 

DPD hourly rate, 1 hour minimum

 

no change

No change to fees, but added clarification of applicability of fees.

Mechanical, Separate from Building Permit Application or Mechanical Only

11

Plan Review Fee – clarified to refer to “all applicable fees”

Jan. 2011

DPD hourly rate, 1 hour minimum

 

no change

 

No change to fees, but added clarification of applicability of fees.

Blanket Permit Review Fees for Earlier Alterations

 

11

Permit Fee

 

Plan Review Fee

Jan. 2011

 

Jan. 2011

 

$2.20 per 100 sq. ft.

 

$2.55 per 100 sq. ft.

 

no change

 

no change

No change to fees, but replaced reference to issuance of first “tenant permit” with “certificate of occupancy” for clarification and consistency with code.

Blanket Permit Review Fees for Later Alterations

11

Permit Fee

 

Plan Review Fee

Jan. 2011

 

Jan. 2011

 

100% of DFI

 

60% of DFI

 

no change

 

no change

No change to fees, but replaced reference to issuance of first “tenant permit and other tenant alterations” with “certificate of occupancy” for clarification and consistency with code.

Nonblanket Permit Initial Tenant Improvements to Shell and Core

11

Permit Fe

 

 

 

Plan Review Fee

Jan. 2011

 

 

 

Jan. 2011.

 

50% of DFT based on new building value of shell and core

 

50% of DFT based on new building value of shell and core

 

no change

 

 

 

no change

No change to fees, but replaced reference to issuance of first “tenant permit” with “certificate of occupancy” for clarification and consistency with code.

Building review associated with platting actions and/or LBAs

12

Plan Review Fee

 

New

 

n/a

 

DPD hourly rate

A new fee is proposed to cover costs of providing service.

Noise Survey Reviews

 

12

Plan Review Fee

Jan. 2011

DPD hourly rate, 30-minute minimum - as referenced in Table D-2; but DPD hourly, 1 hour minimum is what is specified in Table F-2

 

DPD hourly rate, 1 hour minimum

Correction to Table D-2; 1-hour minimum is what is established in Table F-2, where primary authority for this fee resides.

Phased Permits, Value less than or equal to $5,000,000

 

14

Plan Review Fee

2007

Base Fee x 1

 

No change

No change to fee, but clarification that fee applies to phase permits less than or equal to $5 million.

22.900D.145 – Table D-SR

 

 

 

 

 

 

 

Drainage or grading site review

15

Minimum Fee

 

 

 

Review time Included in the minimum fee

2005

 

 

 

2005

1 hour at the DPD hourly rate

 

 

1 hour

 

1 hour for each review location at the DPD hourly rate

 

1 hour each

 

No change to fees, but clarification that it applies to drainage or grading review separate from a development permit or as part of a MUP application; plus additional clarification that fees apply per review location.

22.900D.150 – Table D-15

 

 

 

 

 

 

 

Feeders – please see Attachment B

16

Electrical permit fees for Feeders.

Jan. 2011

Various

 

No change

Fee table is simplified and corrected to reflect actual equipment in use.  Please see Attachment B.

22.900E.050– Table E-4

 

 

 

 

 

 

 

Air conditioning contractor license

20

Fees for licenses and examinations

Jan. 2011

$189

 

n/a

License is being phased out, fee is eliminated.

Refrigeration service shop license

20

Fees for licenses and examinations

Jan. 2011

$85

 

n/a

License is being phased out, fee is eliminated.

Refrigeration service shop mechanic license

20

Fees for licenses and examinations

Jan. 2011

$85

 

n/a

License is being phased out, fee is eliminated.

Industrial refrigeration license

20

Fees for licenses and examinations

Jan. 2011

$85

 

n/a

License is being phased out, fee is eliminated.


 

22.900F.060

 

 

 

 

 

 

 

Housing and Building Maintenance Code Variance Decisions

20

Fees for research, inspections and reviews associated with HBMC variance decisions

New

n/a

 

DPD hourly x 2

New fee proposed to cover costs of providing service.

22.900G.020 – Table G-1

 

 

 

 

 

 

 

Building grade sheet

21

Fees for review by SDOT

2003

$430 for 1-3 lots plus $85 per lot over 3

 

n/a

No longer in use, fee is eliminated.

Processing of right of was dedications

21

Fees for review by SPU

2003

$110 per hour

 

n/a

No longer in use, fee is eliminated.

 

*Date late modified is effective date of change.


 

 

DPD Electrical Feeders Proposed Changes from 2011 Adopted Budget to 2012 Proposed

 

SMC 22.900D.150 – Table D-15, Row 3 – Table Simplification

 

2011 Current:

 

3. Feeders1

 

 

Size

120v-480v

>480v

15-25A

30-50A

15-50A

60-125A

150A & above

150-400A

450 & above

$14

$29

Na

½ x base fee

¾ x base fee

Na

Na

Na (see below)

Na (see below)

¼ x base fee

½ x base fee

Na (see below)

1 x base fee

plan review required

 

 

2012 Proposed:

 

3. Feeders1

 

 

Size

120v-480v

>480v

15-25A

30-50A

60-125A

150A & less than 400A

400A

$14

$29

½ x base fee

¾ x base fee

Plan review required

¼ x base fee

¼ x base fee

½ x base fee

1 x base fee

plan review required

 

 

Track Changes:

 

3.   Feeders1

Size

 

120v-480v

>480v

 

15-25A

$14

((Na (see below)))¼ x base fee

 

30-50A

$29

((Na (see below)))¼ x base fee

 

((15-50A

Na

¼ x base fee))

 

60-125A

½ x base fee

½ x base fee

 

150A & ((above))less than 400A

¾ x base fee

((Na (see below)))1 x base fee

 

((150-400A

Na

1 x base fee))

 

((450 & above))400A

((Na))plan review required

plan review required